enpure. engineering a cleaner world
where we work
home :
who :
  • who we are :
  • who we work for :
  • working with us :
what :
  • what we do :
  • sector :
  • technology :
where :
  • where we are :
  • case studies :
media :
  • news / events :
  • downloads :
contact :
  • contact us :
  • careers :

:

Please download Flash Player to view our images

Completed: 19/06/08
Brixton WTW.

Water

There are two problems in the catchment area served by this scheme in that there is an abundance of groundwater with the inherent problem of flooding whilst at the same time a shortage of potable water in an ever increasing population.

The Thames Water Trident Alliance re-used an existing borehole on the Brixton Reservoir site to abstract ground water from the chalk aquifer and discharge it through a new pressure filtration plant and associated disinfection onto the service reservoir.

  • Download PDF.
    Brixton WTW case study

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • MSW Manchester Bredbury Parkway MBT AD Plant.
  • MSW Manchester Reliance Street MBT AD Plant.
  • Assynt WTW.
    Scottish Water Solutions
  • Ringsend WwTW Sludge Plant Extension.
    Dublin City Council
  • Trosley WTW.
    new build WTW
  • Ringsend Odour Control Plant.
    Celtic Anglian Water
  • Derwenthaugh Ecoparc.
    Autoclave heat treatment  
  • Ipoh WTW.
    Dissolved Air Flotation plant

Filter: date : alphabetically Pages 1 : 2 : 3 : 4 : 5 : 6 : 7 : 8

More information
Privacy Policy
Terms & Conditions :