This scheme was negotiated with Thames Water’s Trident West Alliance to provide a solution to the short programme for providing additional treatment as part of the London Enhancement Scheme.
The scheme has a design maximum output of 61.8 Ml/d and scope included M & E design and construction of Flocculation, Flotation, RGFs, GACs, chemical addition, associated pumps and control panels.
Thames Water submitted the project for a number of awards. The most prestigious recognition being the winner of the British Construction Industry Award for projects valued between £3m and £50m.