enpure. engineering a cleaner world
where we work
home :
who :
  • who we are :
  • who we work for :
  • working with us :
what :
  • what we do :
  • sector :
  • technology :
where :
  • where we are :
  • case studies :
media :
  • news / events :
  • downloads :
contact :
  • contact us :
  • careers :

:

Please download Flash Player to view our images

Completed: 18/07/08
Tempico - John Hopkins.

Solid Waste

 

 

 

Client                         :      Johns Hopkins Hosiptal

Client Contact details   :      Balitmore, MD, USA

Capacity                     :      4,400 tonnes per annum

Description                  :      2500-DS system Medical waste/ MSW

Contract completion     :      1992 – upgraded in October 2005

This installation was originally designed for a Tempico 2500DS system, consisting of two 5 X 15’ Rotoclaves. However following research it was found that there were advantages to having only one vessel with more than twice the capacity of the smaller vessels, and at a lower cost.

 

  • Download PDF.
    Tempico - John Hopkins case study
  • Technology.
    Rotoclave

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • Derwenthaugh Ecoparc.
    Autoclave heat treatment  
  • BTA - References.
    BTA reference sites
  • BTA - Torronto.
    BTA waste site - pretreatment & waste reception
  • BTA - Verona.
    BTA waste pre-treatment site
  • BTA Barcelona Ecoparc 1.
    BTA waste pretreatment plant
  • Tempico - Anderson.
    medical waste Treatment facility
  • Tempico - Bulters.
    medical maste Treatment facility
  • Tempico - Gate Gourmet.
    International airport waste

Filter: date : alphabetically Pages 1 : 2

More information
Privacy Policy
Terms & Conditions :