enpure. engineering a cleaner world
where we work
home :
who :
  • who we are :
  • who we work for :
  • working with us :
what :
  • what we do :
  • sector :
  • technology :
where :
  • where we are :
  • case studies :
media :
  • news / events :
  • downloads :
contact :
  • contact us :
  • careers :

:

Please download Flash Player to view our images

Completed: 05/08/08
BTA - Verona.

Solid Waste

Capacity 150,000 tons/year municipal solid waste, 65,000 tons/year fed into BTA® hydromechanical pre-treatment

Start up: 2000 first start-up, 2002 start-up after refurbishment by BTA/Biotec.

Original plant design included mechanical pretreatment with drum sieve (>80mm first line, >100mm second line); wet-mechanical pre-treatment consisting of mixer, cutter and screen, anaeorbic wet digestion and fluidised bed incineration of PDF and digestate.

BTA retrofitted the wet pre-treatment system to the Verona plant in 2002, to remedy operational problems with the organics separation and treatment system on the plant.

 

  • Technology.
    BTA

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • MSW Manchester Bredbury Parkway MBT AD Plant.
  • MSW Manchester Reliance Street MBT AD Plant.
  • Assynt WTW.
    Scottish Water Solutions
  • Ringsend WwTW Sludge Plant Extension.
    Dublin City Council
  • Trosley WTW.
    new build WTW
  • Ringsend Odour Control Plant.
    Celtic Anglian Water
  • Derwenthaugh Ecoparc.
    Autoclave heat treatment  
  • Ipoh WTW.
    Dissolved Air Flotation plant

Filter: date : alphabetically Pages 1 : 2 : 3 : 4 : 5 : 6 : 7 : 8

More information
Privacy Policy
Terms & Conditions :