enpure. engineering a cleaner world
where we work
home :
who :
  • who we are :
  • who we work for :
  • working with us :
what :
  • what we do :
  • sector :
  • technology :
where :
  • where we are :
  • case studies :
media :
  • news / events :
  • downloads :
contact :
  • contact us :
  • careers :

:

Please download Flash Player to view our images

Completed: 08/09/04
sonix™ - Ulu Pandan .

Energy

Increasing amounts of Waste Activated Sludge and their effect on digester performance prompted Singapore Utilities
International (SU)I on behalf of Singapore Public Utilities Board to install pre-treatment / disintegration of the WAS
fraction at the Ulu Pandan WWTW. Primary drivers for the scheme were greater gas production and solids disposal
costs.

Technology Selection
Following a competitive tendering process starting in Apr 2003 and visits to various installations from various providers in
the EU Sonico were awarded the contract in Apr 2004 to supply a turnkey sonix™ plant. Reasons cited by the client for
award were as follows:
• Simpler process, no need for controlled side stream split,
  hopper & associated instrumentation.
• Lower operational manning requirements
• Operating costs.
• Track record
• Capital cost

Commissioning was completed in September 2004. Since that time the action of sonix™ has increased the gas yield by
between 20 and 35% over the control ESD.

  • Download PDF.
    sonix™ - Ulu Pandan case study
  • Technology.
    sonix™

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • Allers WTW.
    South West Water
  • Assynt WTW.
    Scottish Water Solutions
  • Avlon Effluent Treatment .
    AstraZeneca
  • Bells Green WTW.
    Thames Water
  • Boughton WTW.
    Dee Valley Water
  • Brixton WTW.
    Thames Water
  • Bromborough WwTW.
    North West Water
  • BTA - Kirchstockach.
    Waste reception and pre-treatmen

Filter: date : alphabetically Pages 1 : 2 : 3 : 4 : 5 : 6 : 7 : 8

More information
Privacy Policy
Terms & Conditions :