enpure. engineering a cleaner world
where we work
home :
who :
  • who we are :
  • who we work for :
  • working with us :
what :
  • what we do :
  • sector :
  • technology :
where :
  • where we are :
  • case studies :
media :
  • news / events :
  • downloads :
contact :
  • contact us :
  • careers :

:

Please download Flash Player to view our images

Completed: 09/02/02
Chelmsford Sludge Reception Plant.

Energy

General
The project brief was to improve the tanker imports to the site. Process selection was chosen in order to utilise the Anglian water framework for sludge screening.

Design Basis
This project was designed in order to provide a reception tank to act as a buffer for both imports and indigenous sludge and then pump it via dedicated duty/assist pumps and sludge screens to an existing Picket Fence Thickener.The thickened sludge pumps were replaced to accommodate the increased throughput.
A new kiosk with MCC was provided for the plant controls and instrumentation.

  • Download PDF.
    Chelmsford Sludge Reception Plant case study
  • Technology.
    Anaerobic Digestion

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • MSW Manchester Bredbury Parkway MBT AD Plant.
  • MSW Manchester Reliance Street MBT AD Plant.
  • Assynt WTW.
    Scottish Water Solutions
  • Ringsend WwTW Sludge Plant Extension.
    Dublin City Council
  • Trosley WTW.
    new build WTW
  • Ringsend Odour Control Plant.
    Celtic Anglian Water
  • Derwenthaugh Ecoparc.
    Autoclave heat treatment  
  • Ipoh WTW.
    Dissolved Air Flotation plant

Filter: date : alphabetically Pages 1 : 2 : 3 : 4 : 5 : 6 : 7 : 8

More information
Privacy Policy
Terms & Conditions :