Completed: 02/02/10
Trosley WTW.

Water

The scheme included:-
• Raw water feed pipework diversions
• Aeration plant with chlorine dosing
• Flocculation
• Rapid gravity filtration plant (to be located in the Old Pumping Station Building)
• Chlorine contact and backwash tanks
• Chlorination plant
• Refurbishment of the existing sludge plant

At Borough Green the GAC filter plant was removed and raw water is now transferred directly to Trosley WTW for treatment.
These works encompassed:-
• New borehole pump
• Rehabilitation of borehole head works (civil, mechanical and electrical)
• Demolition of the existing meter/control room (to be replaced by a GRP kiosk)
• Dismantling and removal of the chlorination building and GAC filter units

Conclusion

The plant was built to meet South East Water’s treated water quality targets and was available for service by 18th December 2009 some 10 months from contract award.

 

  • Download PDF.
    Trosley WTW case study

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • Bromborough WwTW.
    North West Water
  • Claudy WwTW.
    Northern Ireland Water
  • Allers WTW.
    South West Water
  • Bells Green WTW.
    Thames Water
  • Boughton WTW.
    Dee Valley Water
  • Brixton WTW.
    Thames Water
  • Holmbridge WTW.
    Yorkshire Water
  • Jebel Ali Thermal Sludge Dryer.
    Dubai

Filter: date : alphabetically Pages 1 : 2 : 3 : 4

More information
Privacy Policy
Terms & Conditions :