enpure. engineering a cleaner world
where we work
home :
who :
  • who we are :
  • who we work for :
  • working with us :
what :
  • what we do :
  • sector :
  • technology :
where :
  • where we are :
  • case studies :
media :
  • news / events :
  • downloads :
contact :
  • contact us :
  • careers :

:

Please download Flash Player to view our images

Completed: 19/06/08
Allers WTW.

Water

As part of their AMP4 early start programme of works, South West Water contracted their AMP3 East Framework Partners, of which Enpure was one, to deliver a series of projects in Devon. The scheme objective was to provide a pesticide removal process stream at the Allers works. This took the form of six GAC contactors complete with all associated pipework, valves, flowmeters, instrumentation, media, etc. Leopold floors were utilised within the contactors.

  • Download PDF.
    Allers WTW case study

Case Studies.

All
Water
Solid Waste
Energy
Industrial
  • Allers WTW.
    South West Water
  • Assynt WTW.
    Scottish Water Solutions
  • Avlon Effluent Treatment .
    AstraZeneca
  • Bells Green WTW.
    Thames Water
  • Boughton WTW.
    Dee Valley Water
  • Brixton WTW.
    Thames Water
  • Bromborough WwTW.
    North West Water
  • BTA - Kirchstockach.
    Waste reception and pre-treatmen

Filter: date : alphabetically Pages 1 : 2 : 3 : 4 : 5 : 6 : 7 : 8

More information
Privacy Policy
Terms & Conditions :